Let it Begin… Let it Begin!!!

Hard to believe it’s been two months, but the holidays are crazy and the cold set in a bit sooner and harder than is normal for Georgia, so my days in the garage have been sparse (I know excuses, excuses…). But I have made good use of the time I have had and I am happy to announce that all of the parts are cut, drilled (~100 cross dowel connections), and ready to assemble.

This is my first time going from a 3d drawing to a physical machine, which very exciting for me. I expect things should move relatively quick from this point on, since I believe I have everything else I need. I may decide to buy some new motors rather than pulling the ones off the Rockcliff Model ‘D’, as they are only 116oz and I was planning on putting 2 on the X axis to handle moving the gantry, it would be a lot easier with just 3 more powerful motors.

Hopefully I will make enough weekly progress to make posting worth while, this should not take more than a month even for me.

Here are a few pics of the parts waiting for assembly… Let it begin… let it begin!!!

Stacked and waiting

Stacked and waiting

All laid out for inspection

All laid out for inspection

Tags: , , , ,

3 Comments

  • Arturo says:

    Great! I cannot wait to see the final results!

  • grumpygeek says:

    Me neither :) Spent the weekend rearranging the garage so I had room to work in (more delays). I was planning on starting assembly last night, but ended up spending too much time in the garage finishing up the lead nuts and bearing blocks. Hopefully tonight I will get all the major assemblies put together, I put the Y carriage together to test the clearances of the pipe assembles and looks awesome!!!

  • Robert says:

    Congrads and Happy New Year!